|
Permitting / Siting
Permit applications
Public hearing preparation
Conceptual Design
Cost – Benefit Analysis of various design and site layout options
Construction Level Drawings and Specifications
3D electronic design that can be loaded directly into surveyor’s total station
Airspace Management
Annual airspace and waste density calculations
Site capacity and year-of-closure calculations
Calculations / Analysis
Leachate generation and flow modeling
Slope stability
Geosynthetic material selection
Surface water management and detention Pond design
Geotechnical calculations
Soil loss and erosion control
Groundwater modeling
Landfill gas modeling
Phasing Plans
Year-by-year phasing for operational planning
Big picture phasing for permit level design
Closure/Post – Closure Plans and Cost Estimates
Closed Landfill Management
Post closure monitoring and maintenance
Closure / post-closure plans and cost estimates
Probabilistic cost estimates
End Use Plans
Other Required Plans
Operations Plan
Stormwater Pollution Prevention Plan
Locations Restrictions Plan
Emergency Response Plan
Litter Control Plan
SPCC Plan
Regulatory Negotiations
|
Innovative Ideas That Have
Helped Our Clients
• Smart phasing that maximizes airspace for every acre of liner constructed
• Alternative final cover design and
performance demonstration
• RD&D permitting, design, and monitoring
• Leachate recirculation and liquid
addition permitting
• Alternative base liner design and
performance demonstration
• Final grading options that dramatically increase airspace without increasing maximum height or footprint
• Minimize closure and post closure financial assurance obligations
• Creative End-Use Plans that maximize airspace
|